Start with the supply boundary
An empty enclosure is generally the cabinet, cover, door and mounting provisions. A complete assembly may include busbars, protective devices, internal wiring, terminals, labelling and testing. The exact scope depends on the project specification.
Details to prepare
- Mounting type, enclosure material, dimensions and required number of ways
- Incoming and outgoing circuit schedule, device models and ratings
- Busbar arrangement, terminals, cable entry and internal layout
- Destination market, project standard and documentation requirements
Documents follow the exact configuration
Product certificates and test reports should be checked by model and configuration. Requirements for a finished assembly may differ from those for an empty enclosure. Confirm the applicable standard and evidence with your project team before procurement.
Ready to discuss your board?
Send us a drawing, circuit schedule or specification. We can clarify the supply scope before preparing a proposal.
Discuss a board ↗